By creating deep wells around the vicinity the groundwater is made to fall into them under the influence of gravity.
Well point dewatering system procedure.
This method uses the venturi principle where high pressure water is circulated through eductors in the base of each well to create a vacuum that helps promote drainage.
The following procedure is adopted in the well point.
In appropriate ground conditions a wellpoint system can be installed speedily and made operational rapidly.
Wellpoint dewatering is widely used for excavations of shallow depths especially for pipeline trench excavations.
Wellpoint dewatering is a simple yet efficient method of lowering the water table in excavations.
A wellpoint dewatering system consists of a series of shallow wells known as wellpoints which are installed at a pre determined depth and appropriate spacing around an excavation.
Procedure of well point system.
Water is released at the rate of 20 to 25 liters per second at these well points which causes the soil to be dug and the well point to sink deeper into the ground.
Well point systems and ancillary dewatering equipment can be hired for short and long periods of time and individually to cater to the clients dewatering requirements.
Well point assemblies made up of a well point screen riser pipe and swing joint with tuning are generally installed by jetting.
Generally well point system is used to lower the ground water table up to 6 m or less.
In well point system the water is generally lifted by difference between ambient air pressure and the lowered pressure created by the pump.
The eductor well method is a dewatering process used to control pore water pressures in materials with low permeability characteristics such as fissured clays or silts.
Out of them dewatering by well point system is one of the best logical and economical method.
Well points are prepared at a distance of about 1m around the area to be excavated.
A filter media of 3 16 inches 3 5 mm screened black sand shall be inserted around the 3 4 depth of the wells to act as barrier against fines and prevent choking of well points.
The main header pipe is connected to a wellpoint dewatering pump and then discharged either to a designated point or through a water treatment system depending on water quality.
Ads can efficiently and effectively install a well point system to reduce construction downtime our experienced team has the know how to do this with minimal impact on program.
Operate the dewatering system continuously 24 hours a day until drain and structures have been constructed to fill material and until written by authorization to.